Step 1 – Initial Site Visit, Design & Measure

The process begins with an on-site consultation where our team visits your property to measure the area and discuss your vision for the project.

During this visit, we will:

  •  Measure the proposed installation area
  • Discuss the design and layout that best achieves the result you are hoping for
  • Assess site conditions and existing structures
  • Identify any factors that may influence the design or approval process

At this stage, we also design the proposed system while taking into consideration all relevant council requirements, including:

  • Boundary setbacks
  • Maximum height allowances
  • Required fire ratings (where applicable)
  • Overall site coverage limits
  • Any other applicable planning or building regulations

By considering these requirements from the outset, we can design a louvre roof system that not only meets your expectations but also complies with council regulations, helping to avoid delays during the approval process.

For commercial clients, the process follows the same steps, though the initial ‘Planning approval’ stage is almost always required.

 

Step 2 – Drafting

Once the design has been confirmed, the next stage is the preparation of detailed plans for council submission.

Using the existing house plans as a base reference, our drafting team prepares an initial set of drawings showing the proposed structure and how it integrates with the existing dwelling.

These plans typically include:

  • Site plan showing the location of the proposed structure on the property
  • Elevations outlining heights and structural layout
  • Detailed construction information required for approval

The drawings will also include key technical details such as:

  • Structural fixing and connection details
  • Drainage design and water management
  • Integration with existing building elements
  • Any additional information required for council review

These plans form the foundation of the documentation used for the council approval process and ensure the proposed louvre roof system meets all relevant building requirements.

 

Step 3 – Engineering Certification

Once the draft plans are complete, they are submitted to a structural engineer for review and certification. Your initial drawings are prepared with as much detail as possible based on our extensive experience installing louvre roof systems. The engineer then conducts structural calculations to confirm that all materials, structural members, and fixings are appropriate for the specific project.

During this stage, the engineer may:

  • Review and confirm the structural design
  • Recommend adjustments to materials, beam sizes, or fixings if required
  • Confirm compliance with Australian structural standards

In some cases, the engineer may request previously certified drawings of the existing dwelling from the client. This allows them to confirm that the part of the house the louvre system will be fixed to, or built adjacent to, is structurally suitable to support the new structure.

Once the engineer has completed their structural calculations and confirmed the design, the drawings are formally stamped and issued as structurally certified plans. These certified plans are then ready to proceed to the building certification stage.

 

Step 4 – Building Certification

Once the engineering certification has been completed, the full set of plans is submitted to a private building certifier for assessment.

The building certifier reviews the documentation to ensure the proposed structure complies with all relevant Australian building codes and regulations. Their role is to confirm that the design meets the requirements of the National Construction Code (NCC) and is suitable to be submitted for council approval.

During this stage:

  • The certifier assesses the complete plan set and engineering documentation
  • They verify compliance with Australian building standards
  • Any additional compliance requirements are identified

In some situations, a fire engineer may need to be engaged to provide a performance solution where standard building code requirements cannot be met due to site constraints such as boundary proximity.

Once the building certifier is satisfied that the design meets all required regulations, they will issue a Certificate of Design Compliance (CDC). This certificate confirms that the design complies with building regulations and allows the application to proceed to formal council submission.

 

Step 5 – Council Submission & Approval

Once the Certificate of Design Compliance (CDC) has been issued, the project documentation is ready to be formally submitted to the local council for approval.

At this stage, the complete documentation package is prepared and lodged. This typically includes:

  • Certified architectural drawings
  • Structural engineering certification
  • Certificate of Design Compliance (CDC)
  • Any additional supporting documentation required by the local authority

The council will then review the application to ensure the proposed structure complies with all relevant planning policies, zoning requirements, and local regulations.

During this process, council may:

  • Approve the application as submitted
  • Request additional information or minor amendments
  • Apply specific conditions to the approval

Approval timeframes can vary depending on the local council, complexity of the project, and current application volumes.

Once the council has completed their assessment and issued approval, the project is cleared to proceed to the construction and installation stage.

Working with a team you can trust

Navigating the council approval process can feel complex, but with the right team managing each stage, it becomes a straightforward part of getting your project underway. From the initial site visit through to formal council submission, Cover Co. handles the details so you can focus on the result.

Our focus is on delivering outdoor structures that are well-designed, compliant and built to last. If you are planning a louvre roof for your home or commercial project, our team can walk you through the approval process and help you understand what to expect. Get in touch with us today to get started.

ASK US FOR YOUR FREE QUOTE

This field is for validation purposes and should be left unchanged.
Name*
Address
Residential or Commercial?*
What are you looking for?*
Preferred Day*
Preferred Time*